DN mm |
Qn m³/h |
Qt m³/h |
Qmin m³/h |
Qmax m³/h |
dP kPa |
L mm |
DN 'Up' DN 'Down' |
price |
---|---|---|---|---|---|---|---|---|
15 | 0.60 1.5 |
- - |
0.006 0.015 |
1.2 3.0 |
9.0 8.0 |
110 110 |
not required not required |
production of discontinued |
20 | 0.60 1.5 2.5 2.5 |
- - - - |
0.006 0.006 0.010 0.019 |
1.2 3.0 5.0 5.0 |
9.0 8.0 10 10 |
130 130 130 190 |
not required not required |
production of discontinued |
25 | 3.5 6.0 |
- - |
0.035 0.024 |
7.0 12 |
4.0 13 |
260 260 |
not required not required |
production of discontinued |
32 | 3.5 6.0 |
- - |
0.035 0.024 |
7.0 12 |
4.0 13 |
260 260 |
not required not required |
production of discontinued |
40 | 10 10 |
- - |
0.040 0.10 |
20 20 |
10 10 |
300 300 |
not required not required |
production of discontinued |
50 | 15 15 |
- - |
0.060 0.15 |
30 30 |
8.0 8.0 |
270 270 |
not required not required |
production of discontinued |
65 | 25 25 |
- - |
0.10 0.25 |
50 50 |
8.0 8.0 |
300 300 |
not required not required |
production of discontinued |
80 | 40 |
- |
0.16 |
80 |
8.0 |
300 |
not required not required |
production of discontinued |
100 | 60 60 |
- - |
0.24 0.60 |
120 120 |
8.0 8.0 |
360 360 |
not required not required |
production of discontinued |
DN - nominal diameter (FL, G - flanged and threaded execution), mm.
Qn - nominal flow rate, m³/h.
Qt - transitional flow rate, m³/h.
Qmin - minimum flow rate, m³/h.
Qmax - maximum flow rate, m³/h.
dP - pressure loss across the flow meter at nominal flow rate, kPa.
L - length along the pipeline axis, mm.
DN 'Up' - the minimum required length of straight pipe upstream of the flowmeter necessary to ensure measurement accuracy, in nominal diameters, mm.
DN 'Down' - also downstream of the flow meter, mm.
question : comment : feedback
1 487 | visitors yesterday |
visitors per month | |
23 501 | from United States |
73 417 | from all countries |