Project installation of a water meter

Project installation of a water meter

Water meter installation project must be carried out by a specialized organization with a license to perform this type of work. The basis for developing a water meter installation project is technical conditions issued by the water supply organization. The water meter installation project must be coordinated with the water supply organization.

The water meter project should include:

  • Calculation of maximum hourly water consumption
  • Calculation of maximum second flow rate
  • Selection of water meter
  • Calculation of pressure losses at the meter during the calculated water flow rate
  • Installation diagram of the measuring node
  • Specification for the components of the measuring node

question : comment : feedback

where to notify about the reply. not published anywhere
water flow rate
through the heat meter
m³/h

community of experts

We are gathering a community of experts in the design, installation, and service of heating, hot water, and water supply systems in United States. Join the community and you will receive emails with requests for work in United States from our visitors.

design
installation
service
heating
water supply
conditioning
dealers
advertising on the website

about us

our library

United States

add your company to the catalog